February 27, 2007

2.26

kismet

course

distr paper & proposal.

so tired.

February 26, 2007

business attire

Somebody said I’m better looking in a business attire.

Is it so?

busi attire

it makes me uneasy.

in cougar

that’s me, man.

2.25

project proposal

kismet

February 25, 2007

2.24

helped Zack to move his house.

Distributed system project proposal.

February 24, 2007

2.23

surveying on vehicle wireless mesh (ad hoc).
there are research about such a network, but it seems that no one has considered combining it with open wiki access point.

went to Brad’s for a game night. dizzy with Halo in XBOX.

Their cute baby son is simplely not interested in me. So sad…

Talked something interesting with Kelvin. Great.

February 23, 2007

2.22

only one thing today:

the business career fair in Hilton Hall.

put on business attire for the first time. i practiced how to tie a tie in the rest room for 5 times.

This is my first formal encounter with the recruiting stuff of US companies.

The good news is, it’s not hard to communicate with corporate people here. But I do need more practice, though.

The bad news : I don’t know most of the companies here. And my resume is pretty scratchy.

Spent the night writing the online resume in career center. Haven’t worked on resume for a long time.

3 decisions:

1. List target companies and study them thoroughly.

2. Online resume and profile in major career sites and networking sites. Perhaps I need to run a server of my own as well. More planning is needed to combine those well together.

3. Target at wireless related interns and start real application.

2.21

data structure homework

distributed system project survey.

2.20

Rong was mad at my presentation.

I didn’t have the time to draw graphs in slides to demonstrate the algorithm. So I just wrote on the white board with a marker. I marked my hand and face all over with my marker, but nobody could see it because of the light. When I finished nobody had any questions. I guess eye sight is an sensitive topic.

2.19

kismet

prepare for the presentation in distributed system, but really don’t have enough time.

2.18

project discussion with Soji.

Rong broke into the office cause she forgot her key.

I stole some of her food when she was out for key.